FUSION NORD SUD

HDPE Fusion Experts for the Mining Sector

Fusion solutions built to last

For over 25 years, Fusion Nord Sud has been supporting mining companies on major projects with customized solutions in HDPE pipe fusion and hydraulic management.
Our certified, passionate, and experienced team masters every aspect of the process — from fusion and electrofusion to thawing, winterization, and the fabrication of complex systems.
We understand the realities on the ground and deliver turnkey services that are safe, efficient, and precisely adapted to each client’s operational needs.
Because every project is unique, we take a human-centered, solution-driven approach to ensure reliable, long-lasting results delivered with precision.

Our strength: technical expertise, versatility and commitment to quality.

Our specialized services for the mining sector

End-to-End HDPE Fusion with McElroy Fusion Machines (Data Logger)

McElroy equipment (TracStar + data logger). Guaranteed joint quality with full traceability.

Electrofusion and Saddle Fusion

Ideal for confined spaces and precise repairs.

Industrial Pump Installation

All types and configurations, with custom integration.

Surface Water Management (Dewatering)

Faster drainage, safer worksites.

Tailings Line Management

Reliable, high-resistance solutions for extreme environments.

Manufacture and Repair of Pumping Circuits

Modular or fully customized design.

Pig Launcher Systems for Pump Line Cleaning

Preventive maintenance for optimal performance.

Circuit Thawing and Winterization (Pipes and Pumps)

Efficient preparation for harsh winter conditions.

Custom Systems

Innovative solutions tailored to your field conditions. Expertise in operating heavy machinery.

Some of our recent projects

Fusion of 32-inch pipe using McElroy TracStar 900 for pipeline installation.

Fusion of 4 km of insulated 8-inch DR11 pipes using client-supplied equipment.

On-site pipe preparation for in-place fusion. It reduces transportation needs and minimizes the risk of damage.

Final result of in-place fusion of 5 km of 32-inch pipes.

Fusion of 3 km of 8-inch SDR11 & SDR9 pipes, including suction fabrication and installation of two HL 250 pumps.

Fusion of 3 km of 8-inch SDR11 & SDR9 pipes, including suction fabrication and installation of two HL 160 pumps.

Need a reliable partner for your fusion or mine water management projects?

Contact us for a custom quote.

Contact

Email: fusionnordsud@gmail.com
Phone: 450-917-1278 | 819-527-6225

© 2025 Fusion Nord Sud. All rights reserved. Design and integration Kwartz Studio.